
3 phase padmount transformers
Padmount transformers on site in as little as 6 to 8 weeks
UL and ANSI certified 3 phase padmounts up to 10 MVA, built to your spec for data centers, industrial sites and mining.
Get my quote- Energize sooner
- Drawings in 1 to 2 weeks
- Certified for mission critical power
- Delivery from
- 8 weeks
- Power rating
- Up to 10 MVA
- Drawings and specs
- 1 to 2 weeks
- Certified
- UL / ANSI
Why BiXBiT USA
What you get, and what it means for your schedule
Energize sooner
Reserved production capacity brings delivery down to as little as 6 to 8 weeks, so your pad is not the reason the site waits.
Drawings in 1 to 2 weeks
Rapid design support gets drawings and technical specs in front of your engineer typically within 1 to 2 weeks.
Certified for mission critical power
Every unit meets UL and ANSI standards and is DOE 2016 compliant.
Built for continuous load
Engineered for continuous duty with strong thermal and insulation performance.
U.S. service and support
A U.S. based team supports installation, commissioning and long term operation.
Warranty that fits the project
Coverage runs 12 to 24 months, with extended warranties available.
Every week waiting on equipment is a week your site sits dark. We build to shorten that wait.
Specifications
Padmount transformers at a glance
- Type
- 3 phase padmount, liquid filled
- Power rating
- Up to 10 MVA
- Standards
- UL, ANSI, DOE 2016
- Design support
- Drawings and specs in 1 to 2 weeks
- Delivery
- As little as 6 to 8 weeks
- Warranty
- 12 to 24 months, with extended warranties available

How it works
Three steps from spec to site
- 01
Send your specs
Tell us the rating, voltage, quantity and timeline. A one line or a spec sheet is enough to start.
- 02
Review drawings and pricing
Our engineering team returns a quote with drawings for your approval.
- 03
Build, deliver and support
We build to the approved drawings, ship to your site and stay with you through commissioning.
Questions
Common questions
How fast can you deliver a padmount transformer?
In as little as 6 to 8 weeks, using reserved production capacity. Your exact date depends on rating, voltage and quantity, and we confirm it on the quote.
What do you need from me to quote?
A full spec sheet or nameplate, your RFQ document, and general information including destination, timeline and quantity.
What standards do your transformers meet?
UL and ANSI, and they are DOE 2016 compliant.
What is the warranty?
12 to 24 months, with extended warranties available. The term is set per project.
Can you build to a custom specification?
Yes. Send your requirements and our team will return drawings for approval, typically within 1 to 2 weeks.
Do you support the install?
Yes. Our U.S. based service team supports installation, commissioning and ongoing operation.
Get your padmount transformer quote
Send your specs and we will come back with pricing, drawings and a delivery date.