
Power distribution
Power equipment
that shows up on time.
Transformers, switchboards and generation built to U.S. standards, with lead times that keep your energization date intact.
- Padmount delivery from
- 8 weeks
- UL 891 switchboards
- Up to 4000 A
- Substation rating
- Up to 300 MVA
- Gas turbine range
- 10 to 500+ MW
Product lines
Everything between the utility and the load
The transformer should never be the reason a site waits.
How it works
Three steps from spec to site
- 01
Send your specs
Rating, voltage, quantity and timeline. A spec sheet or one line diagram is enough to start.
- 02
Review drawings and pricing
Our engineering team returns a quote with drawings for your approval.
- 03
Build, deliver and support
We build to the approved drawings, ship to site and support commissioning.
Get pricing and a delivery date
Tell us what you need and when. We will come back with a quote and drawings.


