Skip to content
A row of green padmount transformers beside a data center at dusk

Power distribution

Power equipment
that shows up on time.

Transformers, switchboards and generation built to U.S. standards, with lead times that keep your energization date intact.

Padmount delivery from
8 weeks
UL 891 switchboards
Up to 4000 A
Substation rating
Up to 300 MVA
Gas turbine range
10 to 500+ MW

The transformer should never be the reason a site waits.

How it works

Three steps from spec to site

  1. 01

    Send your specs

    Rating, voltage, quantity and timeline. A spec sheet or one line diagram is enough to start.

  2. 02

    Review drawings and pricing

    Our engineering team returns a quote with drawings for your approval.

  3. 03

    Build, deliver and support

    We build to the approved drawings, ship to site and support commissioning.

Get pricing and a delivery date

Tell us what you need and when. We will come back with a quote and drawings.