Our team is here to help you design, price, and deploy the right system.

Hydro-Cooled Mining System

For Bitcoin Mining — Scalable, Efficient, Ready to Deploy

Hydro-Cooled Mining Containers built for industrial Bitcoin farms. Delivers 1.2–2.4 MW of power with integrated CDU, dry cooler, and PLC automation. UL-certified with PUE as low as 1.03.

Each BiXBiT Hydro Container delivers 1.2 MW or 2.4 MW of cooling capacity in a pre-engineered, 40-foot HQ unit.

The system is built for continuous operation, ensuring stable hashrates and reduced downtime for high-capacity mining operations.
The unit arrives fully configured, requiring only power and water connections on-site. With pre-installed racks, CDU systems, hydraulic piping, and integrated monitoring, deployment is fast, simple, and cost-efficient.
  • High density with
    lower costs

Deploy up to 240 miners per container, reducing footprint and infrastructure spend.

  • Turnkey deployment

CDU, Smart PDU, racks, and dry cooler all factory-integrated, cutting build time from months to weeks.

  • Engineered for uptime

N+1 redundant pumps, automated monitoring, and UL/IEEE-certified components ensure 24/7 reliability.

Container Size: 40 ft HQ
Miner Capacity: Up to 240 ASIC Hydro units
Cooling Capacity: 1.2 or 2.4 MW
Water Flow Rate: ~26,400 gal/hr (100 m³/hr)
Water Inlet Temperature: 104 °F (40 °C) @ 95 °F ambient
Water Outlet Temperature: 131–140 °F (55–60 °C)
Electrical Supply: 2 × 1200A, 3-phase, 380–480 V, 50/60 Hz
Monitoring & Control: Smart PLC touchscreen, leak detection, temperature control, alarms
Noise: < 76 dB(A) @ 33 ft
Weight (shipping): ~15.4 tons

Request Your Hydro-Cooled Container Quote

Submit your configuration — our engineering team will deliver pricing and drawings within 24 hours.
1
2
When do you need delivery?*
    Best Way to Contact You?*

    Why Operators Choose BiXBiT Hydro-Cooled Mining Containers

    💧 High-Density Cooling

    Up to 2.4 MW per unit; PUE ≈ 1.03

    Plug-and-Play Deployment

    Fully wired, pre-tested modules — ready to power on arrival.

    ⚙️ Integrated CDU + Dry Cooler

    Certified Components

    Parameter 1.2 MW Model 2.4 MW Model
    Cooling Capacity 1.2 MW 2.4 MW (double loop)
    Miner Capacity 120 × Whatsminer M63/M53 Hydro 240 × Whatsminer M63/M53 Hydro
    Container Size 40 ft HQ (12192 × 2438 × 2896 mm) 2 × 40 ft HQ combined module
    Racks 6 12
    Cooling Medium Pure or soft water + antifreeze/corrosion inhibitor Same
    Water Flow Rate 100 m³/h 200 m³/h
    Water Inlet Temp 40 °C @ 35 °C ambient Same
    Flange Connection DN100 DN150
    Max Power Load 1.4 MW 2.8 MW
    Power Supply 2 × 1200 A (3-Phase 380–480 V, 50/60 Hz) 4 × 1200 A (dual feed)
    Network 6 × 100 Mbps Switches 12 × 100 Mbps Switches
    Monitoring & Control PLC HMI with constant-pressure control & alarms Dual PLC redundant controllers
    Ambient Temp Range –20 °C to 45 °C (5–95 % RH) Same
    Noise Level < 76 dB(A) @ 10 m < 78 dB(A) @ 10 m
    Certification UL marked components UL marked components
    Non-Mining Power Use 70 kW 140 kW
    PUE ~ 1.03 ~ 1.03
    Shipping Weight 14 T 28 T

    Technical Specifications

    Designed for Industrial-Scale Mining Projects

    01

    Bitcoin Mining Farms (Utility and Private Power Sites)

    02

    Energy Producers Deploying Behind-the-Meter Solutions

    03

    Turnkey Hosting and Co-location Facilities

    Built to Global Standards

    Every BiXBiT system is designed with operator safety and compliance at its core. From emergency shutoffs and leak detection to fire monitoring systems, our infrastructure is built to protect your operations.

    All products are fully compliant with UL, ANSI, and IEEE standards — ensuring reliability, safety, and peace of mind.

    BiXBiT USA Support and Warranty

    All Hydro Containers include a 12-month standard warranty with options for extended coverage up to 36 months.

    BiXBiT USA provides remote support via AMS integration, plus on-site commissioning and training on CDU systems.

    Deploy 1.2 MW or 2.4 MW of Cooling Power in Weeks

    Submit your project specs and receive your custom engineering proposal within 72 hours.

    Request Your MDC 4.0 Quote

    Submit your configuration — our engineering team will prepare pricing and drawings within 72 hours.
    1
    2
    When do you need delivery?*
      Best Way to Contact You?*

      Request Your MDC 4.0 Quote

      Submit your configuration — our engineering team will prepare pricing and drawings within 72 hours.
      1
      2
      When do you need delivery?*
        Best Way to Contact You?*

        Request Your Hydro-Cooled Container Quote

        Submit your configuration — our engineering team will deliver pricing and drawings within 24 hours.
        1
        2
        When do you need delivery?*
          Best Way to Contact You?*

          Start overclocking with our custom firmware

          Unlock the full potential of your Bitcoin mining hardware with our overclocking firmware. Safely and easily increase your hashrate, resulting in higher profitability and faster ROI.
          I Agree
          We respect your privacy and will never share your email address with anyone else.

          Contact Sales

          Want to talk to sales before requesting a quote? Drop a note.
          We respect your privacy and will never share your email address with anyone else.

          Request A Quote

          Which product would you like to get quoted?
          // Replace the JavaScript section in your WPCode snippet with this: